bim project execution plan does not address model quality control procedures. select one: true false

Answers

Answer 1

The statement "BIM project execution plan does not address model quality control procedures" is false because a BIM project execution plan typically includes model quality control procedures to ensure the accuracy and integrity of the model throughout the project.

A Building Information Modeling (BIM) Project Execution Plan (PEP) is a comprehensive document that outlines the procedures and protocols for managing a BIM project from start to finish. The purpose of the PEP is to establish a clear set of guidelines and expectations for all stakeholders involved in the project, including owners, architects, engineers, contractors, and subcontractors.

One of the key components of a BIM PEP is the definition of quality control procedures for the BIM models being used in the project. Quality control procedures are important because they help to ensure that the models are accurate, reliable, and consistent with project requirements and specifications.

Learn more about BIM project: https://brainly.com/question/30051361

#SPJ11


Related Questions

4. Find the future worth in year 10 of an investment that starts at $8000 in year 1 and
increases by 10% each year. The interest rate is 10% per year.

Answers

Explanation:

I have asked question in my profile please tell me the answer

Which of these is a reason an engineer may choose to use a prefabricated
building component?
A. She wants the design to be an original.
B. She wants to use a material that is not standard.
C. She is not concerned with costs.
D. She wants the construction to move quickly.

Answers

The reason an engineer may choose to use a prefabricated  building component is because: D. She wants the construction to move quickly.

A prefabricated  building component is also referred to as prefabs and it can be defined as a component that is fully manufactured to standard in a manufacturing plant or factory and then transported to a construction site, for partial assemblage and usage by an engineer. Some examples of prefabricated  building components are:

FloorPier capsWallsBox beamsComposite parapetsBox piers

Generally, the two (2) main reasons why an engineer may choose to use a prefabricated  building component are:

I. To minimize negative environmental impacts by using standard materials from the manufacturing plant or factory.

II. To make the construction process move quickly.

Read more on prefabs here: https://brainly.com/question/15799927

A site is underlain by a 10 meter layer of saturated gravel with unit weight = 20 kN/m3. Point A is located 5 meters below the ground surface. The horizontal effective stress at point A is 30 kPa. Determine the lateral stress ratio of the soil at point A.

Answers

Answer:

The lateral stress ratio of the soil at point A is 0.3

Explanation:

given that; Unit weight = 20 kNm⁻³ at point A 5m below the ground surface,

vertical stress (\(V_{stress}\)) = 20 kNm⁻³ × 5m ⇒ 100 kNm⁻²

vertical stress (\(V_{stress}\)) = 100kPa

note that; Horizontal Stress (\(H_{stress}\)) is given by k(\(V_{stress}\))

where "k" is the lateral stress ratio

\(H_{stress}\) = k(\(V_{stress}\))

k = \(H_{stress}\) ÷ \(V_{stress}\)

k = 30 kPa ÷ 100 kPa

k = 0.3

In southeast Utah, the San Juan River and its tributaries have cut through hundreds of feet of Paleozoic sedimentary rocks. The photo below shows the Honaker Trail Formation, the Halgaito Formation, and the Cedar Mesa Sandstone. Each unit is composed of rocks that were deposited in distinct environments, and record the transition from a marine to continental setting.
- The Honaker Trail Formation is made up of predominately carbonates, which record deposition in a shallow marine setting.
- The Halgaito Formation is located above the Honaker Trail Formation. This unit is composed of siltstones and sandstones deposited in channel and flood plain environments on a coastal plain.
- The layers of the Cedar Mesa Sandstone make up the steep cliffs of this region. This unit is composed of sandstones, which accumulated mostly in an eolian, or wind-blown environment.
Use the information above and your knowledge of relative dating to rank the geologic events from oldest to youngest. Pay particular to the sediments and depositional environments for each formation.
Oldest Event Youngest Event
__________ ____________
1.Carbonate sediments were deposited in a shallow marine depositional environment.
2. Sediment was deposited in stream and floodplain depositional environments.
3. An abundance of sand was transported and deposited by wind in a large dune field.
4. The San Juan River and tributaries incised downward into preexisting sedimentary rock units.

Answers

Ranking the geologic events from oldest to youngest:

1. Carbonate sediments were deposited in a shallow marine depositional environment.

2. Sediment was deposited in stream and floodplain depositional environments.

3. An abundance of sand was transported and deposited by wind in a large dune field.

4. The San Juan River and tributaries incised downward into preexisting sedimentary rock units.

The San Juan River and tributaries incised downward into preexisting sedimentary rock units. Therefore, the correct order of geologic events from oldest to youngest is: Carbonate sediments were deposited in a shallow marine depositional environment; sediment was deposited in stream and floodplain depositional environments; an abundance of sand was transported and deposited by wind in a large dune field; and the San Juan River and tributaries incised downward into preexisting sedimentary rock units.

To learn more about "geologic events", visit: https://brainly.com/question/31249653

#SPJ11

the fixed scale specifies 10.5 millimeters and the thimble specifies 30 hundredths of a mm. what is the total value shown by the micrometer when you add these readings together

Answers

Answer:

10.80 mm

Explanation:

Given that the reading of the fixed scale is : 10.5 mm

The thimble scale specifies : 0.30 mm

The micrometer reading will be : 10.5 + 0.30 =10.80 mm

Carbon dioxide (CO2) at 1 bar, 300 K enters a compressor operating at steady state and is compressed adiabatically to an exit state of 10 bar, 520 K. The CO2 is modeled as an ideal gas, and kinetic and potential energy effects are negligible. For the compressor, determine (a) the work input, in kJ per kg of CO2 flowing, (b) the rate of entropy production, in kJ/K per kg of CO2 flowing, and (c) the isentropic compressor efficiency.

Answers

Answer:

A.) 0.08 kJ/kg.K

B.) 207.8 KJ/Kg

C.) 0.808

Explanation:

From the question, the use of fluids mechanic table will be required. In order to get the compressor processes, the kinetic energy and the potential energy will be negligible while applying the ideal gas model.

Since the steam is a closed system, the carbon dioxide will be compressed adiabatically.

Please find the attached files for the solution and the remaining explanation.

Carbon dioxide (CO2) at 1 bar, 300 K enters a compressor operating at steady state and is compressed
Carbon dioxide (CO2) at 1 bar, 300 K enters a compressor operating at steady state and is compressed
Carbon dioxide (CO2) at 1 bar, 300 K enters a compressor operating at steady state and is compressed

why are high compression ratios not used in spark-ignition engines?

Answers

Answer:they can cause detonation of the engine

Explanation:Answer and Explanation: High compression ratios are not used in spark-ignition engines as they can cause detonation of the engine. This detonation of an engine is commonly known as knocking. The engine knocking occurs especially when octane-rated fuel is utilized.

High compression ratios are not used in spark-ignition engines because they can cause irregular combustion, such as pre-ignition and knocking, which can reduce efficiency and damage the engine. Pre-ignition is when the fuel-air mixture ignites before the spark plug fires, and knocking is when the mixture detonates unevenly and creates pressure waves that can harm the engine components. These phenomena are more likely to occur when the compression ratio is high because the end-gas temperature and pressure are higher, which increases the reactivity of the mixture. To avoid pre-ignition and knocking, spark-ignition engines need to use high-octane fuels that have higher resistance to auto-ignition. However, high-octane fuels are more expensive and less available than low-octane fuels, which limits the use of high compression ratios in spark-ignition engines. Some possible ways to enable high compression ratios in spark-ignition engines are to use high-pressure gasoline direct injection, which can enhance the air-fuel mixing and flame speed, or to use fuels with high octane sensitivity, which can reduce the end-gas reactivity.

A salvage part is considered aftermarket? true or false

Answers

True
Please give Brainliest.

Tony works as a Sorter in a processing factory. Which qualifications does he most likely have?


teaching skills, for helping people perform farm tasks, and creative thinking skills, for finding ways to process food
safety skills, for handling tools and food products, and honesty, for following rules and regulations
accuracy, for closely inspecting equipment and operating heavy machinery safely
accuracy, for monitoring animals, and patience and determination, for observing and caring for animals

Answers

Answer:

answer is B

Explanation:

Which of the following is true about silicosis?

A. The damage it causes can be reversed
B. It is not a serious concern for construction workers
C. It causes only minor damage to the lungs
D. The damage it causes is irreversible

Answers

Answer:

D. The damage it causes is irreversible

Explanation:

Silicosis is a long term lung disease caused by crystalline silica dust inhalation. There is no cure, and once the damage is done it cannot be reversed.

------------------

Like stated above, the damage is irreversible. Option A is incorrect.

Construction workers are constantly moving to build whatever they're working on. The disease will make it hard to breathe and will have a heavy effect on their lungs, preventing them from properly doing their jobs. Additionally, it's possible to get the disease from this job since you're constantly inhaling dust particles.

Silicosis does major damage to the lungs. The dust particles are attacked by the immune system which causes inflammation and eventually leads to areas of hardened and scarred lung tissue.

Thus, the best option is D.

hope this helps :)

This is a classification of back pain based on duration. A) AcuteB) RecurrentC) ChronicD) All of the above

Answers

Answer:

D) All of the above.

cache memory is available in two forms: level 1, which is found on the cpu chip, and level 2, which can be accessed over a high-speed dedicated interface.

Answers

This statement is generally true.Cache memory is a type of high-speed memory that is used to improve the performance of a computer by reducing the time it takes to access data from main memory.

Cache memory is typically available in two or more levels, with each level providing a progressively larger and slower cache.Level 1 (L1) cache is the smallest and fastest cache, and it is typically located directly on the CPU chip. This allows for extremely fast access to frequently used data and instructions, which can significantly improve performance.Level 2 (L2) cache is typically larger than L1 cache and is located on a separate chip that is connected to the CPU through a high-speed dedicated interface, such as a backside bus. This allows for faster access to frequently used data than main memory, but it is slower than L1 cache.

To learn more about memory click the link below:

brainly.com/question/26975129

#SPJ11

an experiential learning method that uses structured activities to develop teamwork and leadership skills in trainees is known as _____.

Answers

The experiential learning method that uses structured activities to develop teamwork and leadership skills in trainees is known as team building. Team building is an effective way to improve communication, collaboration, and trust within a team. The activities involved in team building aim to challenge individuals and groups to work together towards a common goal, providing opportunities for trainees to develop leadership and problem-solving skills. These activities can take many forms, such as problem-solving challenges, outdoor adventure activities, or even games.

The goal of team building is to foster a positive and supportive team environment that allows individuals to learn from one another and to work towards a shared objective. Ultimately, team building can help organizations to achieve better performance, increased job satisfaction, and improved overall morale.

To learn more about problem click here: brainly.com/question/30142700

#SPJ11

Water flows without friction through a horizontal pipe and enters a section where the cross sectional area is smaller. The velocity profile is uniform at sections 1 and 2.
Water flows without friction through a horizontal
The correct statement about the static pressure p2 relative to p1 and the velocity V2 relative to V1 along the streamline down the center of the pipe is?
(A) p2 < p1 and V2 < V1
(B) p2 < p1 and V2 > V1
(C) p2 > p1 and V2 < V1
(D) p2 > p1 and V2 > V1
(E) The relation between p2 and p1 is indeterminate

Answers

Option C. The correct statement about the static pressure p₂ relative to p₁ and the velocity V₂ relative to V₁ along the streamline down the center of the pipe is p₂ > p₁ and V₂ < V₁.

When fluid flows without friction through a horizontal pipe and enters a section where the cross-sectional area is smaller, the static pressure at the smaller area decreases relative to the static pressure at the larger area, whereas the velocity increases. Therefore, the correct statement about the static pressure p₂ relative to p₁ and the velocity V₂ relative to V₁ along the streamline down the center of the pipe is p₂ > p₁ and V₂ < V₁.

This is because the mass flow rate is conserved across any cross-section of the pipe, and this leads to an increase in fluid speed as the cross-sectional area decreases (and vice versa). As a result, the fluid experiences an increase in velocity head and a decrease in pressure head as it moves from the larger area to the smaller area.

Therefore the correct option is C.

Learn more about "static pressure" at: https://brainly.com/question/14810152

#SPJ11

Two spinners with 3 equal sections are spun. Each spinner is spun at the same time and their results are added together. One is labeled with the numbers 1, 2, and 3. The other is labeled with the numbers 4, 5, and 6. What is the probability of spinning a sum of 6

Answers

The probability of spinning a sum of 6 is 1/9 or approximately 0.11.

To find the probability of spinning a sum of 6, we need to first determine all the possible outcomes. Since each spinner has 3 equal sections, there are a total of 3 x 3 = 9 possible outcomes when the two spinners are spun together. These outcomes are:

List all possible outcomes when both spinners are spun: (1,4), (1,5), (1,6), (2,4), (2,5), (2,6), (3,4), (3,5), (3,6). Identify the outcomes with a sum of 6: (1,5) and (3,4). Calculate the probability: There are 9 total outcomes and 2 favorable outcomes (with a sum of 6). So, the probability is 2/9 (2 favorable outcomes divided by 9 total outcomes).

To know more about spinning visit:-

https://brainly.com/question/22826638

#SPJ11

Technician a says that only manufacturers offer vehicle warranties. technician b says that aftermarket warranties are available for consumers to purchase. which technician is correct?

Answers

Based on the information provided, the technician who is correct is Technician B only.

What is an extended warranty contract?

An extended warranty contract is sometimes referred to as an aftermarket warranty and it can be defined as an elongation of the coverage period on a service agreement that was entered between a manufacturer and the customer (consumers).

Generally, some of the characteristics and features of an extended warranty contract include the following:

An extended warranty contract provides protection beyond the manufacturer's original warranty.An extended warranty contract constitutes a separate performance obligation.An extended warranty contract is available for consumers to purchase.

Based on the information provided, we can reasonably infer and logically deduce that the technician who is correct is Technician B only.

Read more on extended warranty contract here: https://brainly.com/question/27241092

#SPJ1

Whats wrong with the wind turbine?

Answers

Answer:

The wind turbine has little impact on the environment compared to conventional power plants. Meanwhile the Wind turbine can affect the wildlife meaning birds are being harmed by the blades.

Explanation: Hope that helps:)

why are reciprocating engines preferred over other types for small aircraft.

Answers

Due to the physical similarities between diesel & kerosene or single cycle efficiency, efficiency part loading, and a quick starter performance, rotary engines are favored above other kinds for tiny aircraft.

What do engines do?

An engine is a device that transforms fuel energy into mechanical energy, hence generating motion. In the case of cars, the most common fuels utilized by engines, such as the ones that power them, are gasoline and diesel.

How come it's called an engine?

The word "engine" derives from the Latin ingenium, which also refers to mental aptitude or cunning. The term acquired the meanings of inventiveness, contrivance, deception, and malice throughout its transition from French to English.

To know more about Engines visit:

https://brainly.com/question/512733

#SPJ4

Which of the following actions should be performed among cooperating processes?
Select one: a. process synchronization coordination c. both A and B Pag question d. None of the given answers

Answers

Among cooperative processes, the action of process synchronization should be performed. Hence, option (a) i.e. ‘process synchronization’ holds the correct answer.

Process synchronization is the process to handle problems that arise when multiple processes execute simultaneously. Process synchronization refers to the way of coordinating the execution of processes so that no two processes can have access to the same shared resources and data.

On the basis of synchronization, the process is categorized into two types: independent process and cooperative process. If the execution of one process does not impact the execution of the other process, these two processes are known to be independent processes. In contrast, when one process execution is affected by the execution of another process, then these processes are said to be cooperative processes. These cooperative processes require synchronization in order to guarantee an appropriate order of execution.

You can learn more about Synchronization at

https://brainly.com/question/27906996

#SPJ4

Is the iced water a pure substance? Why ?

Answers

Answer:

ice water is pure depending on the purity of the water that was frozen

Give two disadvantages of a moving coil Meter

Answers

1.Only suitable for dc
2.more expensive than moving iron type
3. Easily damaged

How do cars moves? and explain Please.

Answers

Answer:

when car vroom it go electric

Explanation:

i think then it goes to some spinny thing that spins and make the electric and the electic spins the spinny thing and the smoke comes outside the back

Nested for loops. C++
Integer inVal is read from input. For each number from 0 to inVal, output the number followed by the number's value of plus sign characters, '+'. End each output with a newline.
Ex: If the input is 5, then the output is:
0
1+
2++
3+++
4++++
5+++++
------------------------------------------------
#include
using namespace std;

int main() {
int inVal;
int i;
int j;

cin >> inVal;

//Code goes here

return 0;
}

Answers

Here's the code to accomplish the task using nested for loops in C++:

#include <iostream>

using namespace std;

int main() {

   int inVal;

   int i;

   int j;

   cin >> inVal;

   for (i = 0; i <= inVal; i++) {

       for (j = 0; j < i; j++) {

           cout << "+";

       }

       cout << i << endl;

   }

   return 0;

}

Define the term nested.

Nested refers to a situation where one construct, such as a loop or conditional statement, is placed inside another construct of the same type. For example, a nested for loop is a loop within another loop, where the inner loop is executed multiple times for each iteration of the outer loop. Similarly, a nested if statement is an if statement within another if statement, where the inner if statement is only executed if the outer if statement evaluates to true. Nesting is a common programming technique used to solve complex problems by breaking them down into smaller, more manageable parts.

This program reads an integer inVal from input and then uses nested for loops to output each number from 0 to inVal, followed by a corresponding number of plus sign characters. The output for each number is ended with a newline character.

The outer for loop iterates from 0 to inVal, while the inner loop iterates from 0 to i - 1. For each iteration of the inner loop, a plus sign character is output, and after the inner loop, the current value of i is output on a new line. The number of plus sign characters output is determined by the current value of i, since the inner loop runs i times.

Therefore, the program outputs a sequence of numbers followed by a corresponding number of plus sign characters, where the number of plus sign characters for each number increases as the number increases.

To learn more about nested click here

https://brainly.com/question/15020055

#SPJ1

What is the main purpose of the alternater

Answers

Answer:

to keep the battery charged when the vehicle is running, it also helps the battery keep the electrical components in your vehicle charged

Explanation:

You have been asked to participate as an “Engineer in Training” in the design and construction of a nuclear power plant. You will be working in a team of 10 design engineers. Some of the engineers are experienced and capable nuclear plant designers.

 a) Is the use and development of nuclear power plant ethical? Explain(5 marks)

b) Can you participate in the design of such a plant without any previous experience?(5 marks)​

Answers

a. Yes, because you will be working in a team of 10 design engineers and take note some of them are experienced and capable nuclear plant designers.And from what i have learn about engineers, they can't be called engineers for nothing.All you have to do is trust yourself and your team.

b.Of course i cannot but because i have my team (10 design engineers) i know i can do a great job and they are experienced in this stuff so i am confident that i can participate and can make a good job and even if i do not have any experience i know i will learn from them.I can call this assignment as my experience right?

Nuclear power plants uses nuclear fuels as a source of energy.

A nuclear power plant is a power generating plant that makes use of nuclear fuels as a source of energy for power generation. This means of power generation has the advantage that 1 g of nuclear fuel can be used for several years.

On the downside, this means of power generation is prone to hazards such as nuclear explosions and radioactive fallout. This means of power generation is ethical as long as all the safety standards are followed.

I can participate in such a design as a trainee engineer without any previous experience because participating in such project is a huge learning opportunity for me.

Learn more: https://brainly.com/question/1445383

Refer to the exhibit. From what location have the syslog messages been retrieved?
a. syslog server
b. syslog client
c. router RAM
d. router NVRAM

Answers

The exhibit provided does not contain enough information to determine the location from where the syslog messages have been retrieved.

However, based on the context of the question, it is likely that the syslog messages have been retrieved from a syslog server or client.

Syslog is a standard protocol used to send system messages, such as error messages, warning messages, and informational messages, to a centralized logging server or client. This allows network administrators to collect and monitor system events from different network devices in one central location, making it easier to troubleshoot and diagnose network issues. Therefore, it is common for syslog messages to be retrieved from a syslog server or client. However, the specific location of the syslog messages cannot be determined from the exhibit alone.

Learn more about syslog here: brainly.com/question/32137952

#SPJ11

The Rod ABCD is made of Aluminum for which E=70 GPa. Take P=90 kN. For the loading shown, determine the deformation at point B.

The Rod ABCD is made of Aluminum for which E=70 GPa. Take P=90 kN. For the loading shown, determine the

Answers

The deformation at the point of B is 1.09 mm

How to solve for the deformation

Deformation refers to the change in shape or size of a material due to the application of external forces or stress. It is a common phenomenon in materials science and engineering, and it plays an important role in the behavior and performance of materials under various conditions.

E = 70 Gpa

P = 90 KN

For every section

A and B

125 - 90

= 35

For B and C

75 + 50 = 125

For C and D

50

we have

\(\frac{35*10^3*1.75}{800*10^6*70*10^9}\)

= \(\frac{61250}{800000000 * 5.6*10^1^9}\)

= 1.09 mm

Read more on deformation here: https://brainly.com/question/29830237

#SPJ1

Consider a control volume (OPEN system) in which water (density p-1000 kg/m =const) flows from an inlet port 'in' to an outlet port 'out. The following conditions are known: P-1 bar, C-5 m/s, Pout 200 bar, Cout-10 m/s. The viscous dissipations amount to L-1000 J/kg. Neglect the gravitational potential energy variation. The specific work which is done ON THE SYSTEM is: O (A) 18937.5 J/kg O (B) 20862 5 J/kg O (C) 18862.5 J/kg O (D) 20937.5 J/kg

Answers

The correct answer is option (C): 18862.5 J/kg

To determine the specific work done on the system, we can use Bernoulli's equation for steady, incompressible flow along a streamline. Neglecting the gravitational potential energy variation, Bernoulli's equation can be expressed as:

p/ρ + V²/2 = constant

Using Bernoulli's equation between the inlet and outlet ports of the control volume, the equation becomes:

p1/ρ + C1²/2 = p2/ρ + C2²/2 + L

Given the values of inlet pressure (P), inlet velocity (C), outlet pressure (Pout), outlet velocity (Cout), and viscous dissipations (L), we can substitute them into the equation and solve for L:

1/1000 + 5²/2 = 200/1000 + (-10)²/2 + L/1000

Simplifying the equation gives L = 1000 J/kg.

The specific work done on the system is calculated using the formula:

W = (Pout - P)/ρ + (Cout² - C²)/2 - L/ρ

Substituting the given values, we get:

W = (200 - 1)/1000 + ((-10)² - 5²)/2 - 1000/1000

Simplifying further, we find W = -3.5625 kJ/kg. Multiplying this by 1000, we obtain the specific work done on the system as 18862.5 J/kg.

Therefore, the correct option is (C) 18862.5 J/kg.

Learn more about specific work done on the system:

https://brainly.com/question/30531335

#SPJ11

An engine has lower-than-specified oil pressure. Technician A says the oil pressure relief valve may be stuck closed. Technician B says there may be excessive clearance between the oil pump gears. Who is correct

Answers

Both technicians have valid points. Either the oil pressure relief valve is stuck closed or there is excessive clearance between the oil pump gears that's causing the engine to have lower-than-specified oil pressure. The oil pump is an important component of the engine lubrication system.

It's responsible for supplying oil to the engine, which helps reduce friction between moving engine parts. If the oil pressure is low, it can cause significant engine damage. Low oil pressure can be caused by several issues, including worn-out bearings, clogged oil passages, and a malfunctioning oil pump. When the oil pressure is low, the engine's warning light will come on. The oil pressure relief valve is a component in the oil pump that controls oil pressure. If it's stuck closed, oil pressure will build up and cause low oil pressure. Technician A's diagnosis is correct.

On the other hand, Technician B is also correct. If there's excessive clearance between the oil pump gears, the oil pump will not be able to produce enough pressure to circulate oil throughout the engine. This is because the gears are not properly meshing with each other. In summary, both technicians have valid diagnoses and should be able to identify the root cause of the low oil pressure in the engine.

To know more about technicians visit :

https://brainly.com/question/14290207

#SPJ11

A pitot tube is mounted in the test section of a low- speed open- circuit subsonic wind tunnel. Air is flowing through the test section at 100 mph. The air pressure in the test section is 1 atm, and the temperature is 65 F Calculate the pressure measured by the pitot tube.

Answers

Answer:

given

i=100mph

to=65 F

find thd p

p=i*f

p= 65*100=6500

Other Questions
what is the united states government's formal definition of the poverty line? Timothy just finished an exercise where he straightened his arms and brought them together in front of his body. he then bent his arms up at the elbows and then opened them outward, pressing them toward his back. what kind of exercises did timothy complete? common tools being used by a cellphone technician What is the heat energy needed to raise the temperature of 6 63moles of ethanol CH CHO from a temperature of 231 [CH,CH,OH-46.07g/mol) (CCHICHION-2.46J/gC]) 241.6C. The mass of 3.) Consumers Will Engage In This Stage Of The Consumer Decision Purchase Process To Determine Whether A Product They Are Considering Purchasing Will Address Their Specific Need. Multiple Choice a. Purchase b. Information Search c. Evaluation Of Alternatives d. Postpurchase Evaluation e. Problem Recognition Describe some of the challenges that the candidates face. true or false: individuals can have a number of different, even conflicting, reputations. group of answer choices Find the greatest possible prime factor of a four-digit number if the number contains the digits 2, 0, 2, 2, in some order. NO LINKS!!! Please help me with this problem. Part 3 prepare carley communications' statement of owner's equity for the year ended july 31, 2024. assume that there were no contributions or withdrawals during the year and that the business began on august 1, 2023. CAN SOMEONE HELP!!!! How long do i need to self isolate if you are a contact of a person who tested positive for covid-19 Please help asap need this rnwhat is the value of a + b - c if a=20, b=10 and c= 5 and 1/2please show how you found it (show your work) What is typically the largest source of money for a new business? a) The federal government b) Small-town banks c) Family and friends d) Venture capitalists Vhat is the correct formula for trisilicon hexafluoride. What is the correct sequence to arrive at an estimate of value using the income capitalization approach?a. Determine effective gross income, find operating expenses, determine potential gross income, find net operating income Incorrectb. Determine effective gross income, find net operating income, find operating expenses, determine potential gross incomec. Determine potential gross income, determine effective gross income, find operating expenses, find net operating incomed. Determine potential gross income, find net operating income, determine effective gross income, find operating expenses Help plz?????????????? If the space mean speed of traffic on a roadway segment is 50 miles per hour and 150 vehicles per hour are traveling on the segment, the roadway density is ____ vehicles per mile Market structures vary due to: Multiple select question. demand conditions the number of firms in the market scarcity technology and costs ease with which firms can enter or exit the industry the relative size of firms PLS HURRY IM ON A TIMER...President Polk faced very little opposition as he acquired additional territory in the west. How did this lack of accountability lead to his willingness to engage in the Mexican American War?